बड्कापथ |
Construction of core wall and embankment for the protection of Ransing Superpassage |
BIP/SP/NCB-16/079-80 |
Lokmani/Balarupi/Prabhudev Joint Venture, Ghorahi-15, Dang |
2023-03-21 |
43703257.98 |
2023-11-10 |
43421150.59 |
Completed |
Completed |
2080/7/24 |
बड्कापथ |
Construction of RCC Lined Canal on Katengaun & Gairagaun Sinchai Kulo |
BIP/Maintenance/NCB-08/078-79 |
Jana Nirman Sewa, Rolpa |
2022-03-13 |
1677672.85 |
2022-06-29 |
1844599 |
Completed |
Completed |
2079/03/15 |
बड्कापथ |
Construction of RCC Drain along the Badkapath Main Canal & ramp on Rapti Embankment |
BIP/Maintenance/NCB-07/078-79 |
Sahadev Nirman Sewa |
2022-03-14 |
3513062.5 |
2022-06-29 |
3591465 |
Completed |
Completed |
2079/03/15 |
बड्कापथ |
Construction of RCC Lined Canal on Gobahardiya Khaireni Sinchai Kulo |
BIP/Maintenance/NCB-06/078-79 |
Abhisekh Nirman Sewa |
2022-03-03 |
3516571.6 |
2022-06-29 |
3669408 |
Completed |
Completed |
3/15/2079 |
बड्कापथ |
Maintenance of Headworks,Protection works and Canal Lining of Dangalichhap and Aatipakhar Kulo System |
BIP/Maintenance/NCB-05/078-79 |
Birat Nirman Sewa, Lamahi-1, Dang |
2021-12-31 |
4265504.64 |
2023-01-08 |
3902322 |
Completed |
Completed |
2079/09/24 |
बड्कापथ |
Construction of side drain and RCC canal lining from ch. 5+220 to ch.5+300 and ch. 5+520 to ch.5+770 along the Badkapath main canal |
BIP/Maintenance/NCB-04/078-79 |
Rapti Nirman Sewa |
2021-11-10 |
10785864.31 |
2023-10-11 |
10459939.69 |
Completed |
Completed |
2080/06/24 |
बड्कापथ |
Construction of Side Drain, Random Rubble Masonry (RRM) wall, Railing works for the Protection works of Settling Basin |
BIP/Maintenance/NCB-03/078-79 |
Deurali Engineering Company Pvt. Ltd.,Kathmandu |
2021-11-11 |
3763640.91 |
2022-07-08 |
3663883.94 |
Completed |
Completed |
2079/03/24 |
बड्कापथ |
Construction of cana, concrete side drain at ch 3+100 and gabion Revetment at different Location for Protection of canal bank and Escape at ch.3+300 of Badkapath Main Canal |
BIP/Maintenance/NCB-02/077/78 |
Rapti Nirman Sewa |
2021-02-22 |
7796332.5 |
2021-06-09 |
7384735.11 |
Completed |
Completed |
2078/03/25 |
बड्कापथ |
Construction of gabion revetment along with launching apron for protection of the drain & side slope of badkapath main canal at different location |
BIP/Maintenance/NCB-01/077/78 |
Sunchhari Construction |
2021-02-24 |
8079860 |
2021-06-30 |
89,84,081.00 |
Completed |
Completed |
2078/03/25 |
बड्कापथ |
Construction of Bangushree Protection Works |
BIP/RT/NCB -10/075-76 |
Jaljala-Jayama-Swargadwari JV |
2019-09-27 |
159975085.36 |
2021-09-25 |
160422773 |
Completed |
Completed |
|
बड्कापथ |
Construction of Settling basin and Protection Works at BIP |
BIP/ST/NCB -09/075-76 |
Shree Jayanti Nirman Sewa, Kathmandu |
2019-06-30 |
47784606.12 |
2020-06-29 |
46048337 |
Completed |
Completed |
3/15/2077 |
बड्कापथ |
Construction and Maintenance of RT&Canal Structures along the Badkapath main canal |
BIP/MT/NCB-15/079/080 |
सृजना कन्स्ट्रक्सन, बुटवल ११, रुपन्देही |
2079-11-26 |
१,८५,९५,०६५/८३ |
2080-03-25 |
|
Completed |
Completed |
|
बड्कापथ |
जल उपभोक्ता संस्थाको भवन निर्माण |
BIP/BLDG/NCB-14/078/079 |
राप्ती निर्माण सेवा काठमाडौँ ३५ |
2078-07-24 |
४७,२२,५९७/१० |
2079-07-24 |
|
Completed |
Completed |
|
बड्कापथ |
चौकीद कवाटर निर्माण |
BIPMaintenance/NCB-09-078/079 |
सुन छहारी कन्स्टक्सन प्रा.लि. काठमाडौँ ३५ |
2078-11-29 |
१८,०७,३२६/९७ |
2079-05-05 |
|
Completed |
Completed |
|
Badkapath Irrigation Project |
Construction of Canal & Canal Structures (CH 4+150 to 7+300, Bhalubang Bridge Crossing and Cross Drainage Works) |
BIP/MC/NCB-04/072-73 |
Swachhand Nirman Sewa, Kathmandu |
2016-06-05 |
2743212628.39 |
2020-12-05 |
260651840.30 |
Completed |
Completed |
Canal from CH 4+150 to 7+300, Bhalubang Bridge Crossing and Cross Drainage Works |
Badkapath Irrigation Project |
Procurement and Installation of Intake and Escape Gates and accessories of Badkapath Irrigation Project. |
BIP/GT/NCB-11/075/76 |
MS Shiva Shakti Sakura Power JV Kathmadu |
2019-09-15 |
26,566,001.09 |
2020-04-11 |
26565526 |
Completed |
Completed |
Under Defect Liability Period |
Badkapath Irrigation Project |
Bhalubang Protection works |
BIP/RT/NCB/05/072-73 |
Waiba Construction company pvt. Ltd., Kathmandu |
2016-08-16 |
25366613.47 |
2018-12-25 |
25258436 |
Completed |
Completed |
1.0 km long embankment work @ Right side of river near Bhalubang |
Badkapath Irrigation Project |
Construction of Canal and Structures CH 0+060 to CH 0+450 |
BIP/MC/NCB-08/074/75 |
Lumbini Jaljala JV |
2017-08-22 |
93239102.40 |
2019-07-15 |
95169317 |
Completed |
Completed |
Main Canal 0+060 to 0+450 with Protection |
Badkapath Irrigation Project |
Malmala Protection work |
BIP/RT/NCB-07/073/74 |
Aashish/ Shree Jayanti /Dragon JV |
2017-07-13 |
78711266.44 |
2019-07-15 |
75047345 |
Completed |
Completed |
Malmala Protection work,1.5 K.M |
Badkapath Irrigation Project |
Intake Protection Works |
BIP/RT/NCB/06/073-74 |
Oasis /Shree Jayanti JV |
2017-07-13 |
21917850.00 |
2018-07-13 |
22667499 |
Completed |
Completed |
Protection works 240m @ U/S of Intake @Left side of river |
Badkapath Irrigation Project |
Constrution of Canal and Canal Structures |
BIP/MC/NCB-03/071/72 |
Kumar Shrestha/Ashis Nirman Sewa J./v |
2015-01-25 |
176321414.00 |
2018-07-14 |
179083894 |
Completed |
Completed |
Main Canal 1+360 to 4+150 with structues |
Badkapath Irrigation Project |
Constrution of Canal and Canal Structures |
BIP/MC/NCB-02/071/72 |
Kumar Shrestha Nirman Sewa, Mahendranagar |
2015-01-25 |
102613496.00 |
2019-04-28 |
105558830 |
Completed |
Completed |
Main Canal 0+450 to 1+360 with structues |
Badkapath Irrigation Project |
Construction of Side Intake, Barrel and Protection Work |
BIP/MC/NCB-01/068/69 |
Kalika Pacific JV, Manamohan marga, Kathmandu |
2016-06-05 |
100656219.60 |
2018-06-06 |
92708786 |
Completed |
Completed |
Intake and canal up to 0+060, Intake Protection works |