बड्कापथ |
Canal lining, drain, related structure and protection work aling Badkapath main canal ch. 6+765.25 to 7+372.25 |
BIP/MC/NCB-17/079/081 |
मल्लरानी-के.बि. जे.भी. खलगा, प्यूठान | |
2080-03-17 |
४,६६,६४,६२५/०९ |
2081-03-16 |
|
|
|
Ongoing |
100% |
Ashwin Raut |
Badkapath Irrigation Project |
Construction of Canal and associated structures from Ch.9+000 to Ch.14+450 along Badkapath Main Canal |
BIP/MC/NCB-13/077-78 |
Kalika/Bandan Bhagwati/Buddha Himali JV, Baluwatar, Kathmandu |
2021-04-13 |
780077282.08 |
2026-04-13 |
|
|
|
Ongoing |
24% |
Vijay Roka |
Badkapath Irrigation Project |
Construction of Canal and associated structures from Ch.7+300 to Ch.9+000 along Badkapath Main Canal |
BIP/MC/NCB-12/077-78 |
Kakai/Karna JV,Tokha-06,Kathmandu |
2021-04-12 |
149382060.71 |
2023-04-12 |
|
|
|
Ongoing |
76.83% |
Nabin Gurung |