Name of project Name of work Contract identification number Name and address of contractor Date of agreement Amount of Agreement (Inc VAT/VO) Date of completion Actual Expenditure (inc VAT,price escalation) Contractors liability status Current status Major works completed
बड्कापथ Construction of core wall and embankment for the protection of Ransing Superpassage BIP/SP/NCB-16/079-80 Lokmani/Balarupi/Prabhudev Joint Venture, Ghorahi-15, Dang 2023-03-21 43703257.98 2023-11-10 43421150.59 Completed Completed 2080/7/24
बड्कापथ Construction of RCC Lined Canal on Katengaun & Gairagaun Sinchai Kulo BIP/Maintenance/NCB-08/078-79 Jana Nirman Sewa, Rolpa 2022-03-13 1677672.85 2022-06-29 1844599 Completed Completed 2079/03/15
बड्कापथ Construction of RCC Drain along the Badkapath Main Canal & ramp on Rapti Embankment BIP/Maintenance/NCB-07/078-79 Sahadev Nirman Sewa 2022-03-14 3513062.5 2022-06-29 3591465 Completed Completed 2079/03/15
बड्कापथ Construction of RCC Lined Canal on Gobahardiya Khaireni Sinchai Kulo BIP/Maintenance/NCB-06/078-79 Abhisekh Nirman Sewa 2022-03-03 3516571.6 2022-06-29 3669408 Completed Completed 3/15/2079
बड्कापथ Maintenance of Headworks,Protection works and Canal Lining of Dangalichhap and Aatipakhar Kulo System BIP/Maintenance/NCB-05/078-79 Birat Nirman Sewa, Lamahi-1, Dang 2021-12-31 4265504.64 2023-01-08 3902322 Completed Completed 2079/09/24
बड्कापथ Construction of side drain and RCC canal lining from ch. 5+220 to ch.5+300 and ch. 5+520 to ch.5+770 along the Badkapath main canal BIP/Maintenance/NCB-04/078-79 Rapti Nirman Sewa 2021-11-10 10785864.31 2023-10-11 10459939.69 Completed Completed 2080/06/24
बड्कापथ Construction of Side Drain, Random Rubble Masonry (RRM) wall, Railing works for the Protection works of Settling Basin BIP/Maintenance/NCB-03/078-79 Deurali Engineering Company Pvt. Ltd.,Kathmandu 2021-11-11 3763640.91 2022-07-08 3663883.94 Completed Completed 2079/03/24
बड्कापथ Construction of cana, concrete side drain at ch 3+100 and gabion Revetment at different Location for Protection of canal bank and Escape at ch.3+300 of Badkapath Main Canal BIP/Maintenance/NCB-02/077/78 Rapti Nirman Sewa 2021-02-22 7796332.5 2021-06-09 7384735.11 Completed Completed 2078/03/25
बड्कापथ Construction of gabion revetment along with launching apron for protection of the drain & side slope of badkapath main canal at different location BIP/Maintenance/NCB-01/077/78 Sunchhari Construction 2021-02-24 8079860 2021-06-30 89,84,081.00 Completed Completed 2078/03/25
बड्कापथ Construction of Bangushree Protection Works BIP/RT/NCB -10/075-76 Jaljala-Jayama-Swargadwari JV 2019-09-27 159975085.36 2021-09-25 160422773 Completed Completed
बड्कापथ Construction of Settling basin and Protection Works at BIP BIP/ST/NCB -09/075-76 Shree Jayanti Nirman Sewa, Kathmandu 2019-06-30 47784606.12 2020-06-29 46048337 Completed Completed 3/15/2077
बड्कापथ Construction and Maintenance of RT&Canal Structures along the Badkapath main canal BIP/MT/NCB-15/079/080 सृजना कन्स्ट्रक्सन, बुटवल ११, रुपन्देही 2079-11-26 १,८५,९५,०६५/८३ 2080-03-25 Completed Completed
बड्कापथ जल उपभोक्ता संस्थाको भवन निर्माण BIP/BLDG/NCB-14/078/079 राप्ती निर्माण सेवा काठमाडौँ ३५ 2078-07-24 ४७,२२,५९७/१० 2079-07-24 Completed Completed
बड्कापथ चौकीद कवाटर निर्माण BIPMaintenance/NCB-09-078/079 सुन छहारी कन्स्टक्सन प्रा.लि. काठमाडौँ ३५ 2078-11-29 १८,०७,३२६/९७ 2079-05-05 Completed Completed
Badkapath Irrigation Project Construction of Canal & Canal Structures (CH 4+150 to 7+300, Bhalubang Bridge Crossing and Cross Drainage Works) BIP/MC/NCB-04/072-73 Swachhand Nirman Sewa, Kathmandu 2016-06-05 2743212628.39 2020-12-05 260651840.30 Completed Completed Canal from CH 4+150 to 7+300, Bhalubang Bridge Crossing and Cross Drainage Works
Badkapath Irrigation Project Procurement and Installation of Intake and Escape Gates and accessories of Badkapath Irrigation Project. BIP/GT/NCB-11/075/76 MS Shiva Shakti Sakura Power JV Kathmadu 2019-09-15 26,566,001.09 2020-04-11 26565526 Completed Completed Under Defect Liability Period
Badkapath Irrigation Project Bhalubang Protection works BIP/RT/NCB/05/072-73 Waiba Construction company pvt. Ltd., Kathmandu 2016-08-16 25366613.47 2018-12-25 25258436 Completed Completed 1.0 km long embankment work @ Right side of river near Bhalubang
Badkapath Irrigation Project Construction of Canal and Structures CH 0+060 to CH 0+450 BIP/MC/NCB-08/074/75 Lumbini Jaljala JV 2017-08-22 93239102.40 2019-07-15 95169317 Completed Completed Main Canal 0+060 to 0+450 with Protection
Badkapath Irrigation Project Malmala Protection work BIP/RT/NCB-07/073/74 Aashish/ Shree Jayanti /Dragon JV 2017-07-13 78711266.44 2019-07-15 75047345 Completed Completed Malmala Protection work,1.5 K.M
Badkapath Irrigation Project Intake Protection Works BIP/RT/NCB/06/073-74 Oasis /Shree Jayanti JV 2017-07-13 21917850.00 2018-07-13 22667499 Completed Completed Protection works 240m @ U/S of Intake @Left side of river
Badkapath Irrigation Project Constrution of Canal and Canal Structures BIP/MC/NCB-03/071/72 Kumar Shrestha/Ashis Nirman Sewa J./v 2015-01-25 176321414.00 2018-07-14 179083894 Completed Completed Main Canal 1+360 to 4+150 with structues
Badkapath Irrigation Project Constrution of Canal and Canal Structures BIP/MC/NCB-02/071/72 Kumar Shrestha Nirman Sewa, Mahendranagar 2015-01-25 102613496.00 2019-04-28 105558830 Completed Completed Main Canal 0+450 to 1+360 with structues
Badkapath Irrigation Project Construction of Side Intake, Barrel and Protection Work BIP/MC/NCB-01/068/69 Kalika Pacific JV, Manamohan marga, Kathmandu 2016-06-05 100656219.60 2018-06-06 92708786 Completed Completed Intake and canal up to 0+060, Intake Protection works